Extending your London home in 2025 presents a unique set of challenges. While the fundamentals remain the same—find a good architect, secure planning permission, hire a reliable builder—the landscape has shifted significantly since the pre-pandemic years.
This guide breaks down the major obstacles you'll face, explains why they exist, and offers practical strategies for navigating them. Whether you're planning a modest rear extension or an ambitious basement dig, understanding these challenges upfront will help you plan realistically and avoid costly surprises.
Skilled Labour Shortage
The biggest challenge facing London construction
The construction industry is experiencing its most severe skills shortage in decades. A combination of Brexit-related workforce reductions, an ageing workforce, and insufficient training pipeline has created a perfect storm.
Impact on Homeowners
Longer wait times: Reputable builders are booked 3-6 months ahead
Higher labour costs: Day rates for skilled tradespeople up 15-20% since 2022
Quality concerns: Pressure to accept less experienced workers or crews
Project delays: Subcontractor availability causing schedule overruns
Strategies to Navigate
- 1.Start your builder search early—ideally 4-6 months before you want to start
- 2.Be flexible on start dates to access better contractors
- 3.Get quotes from at least 5 builders, not 3
- 4.Consider builders slightly outside London who travel in
Material Costs & Availability
Prices stabilising but remain elevated
After the extreme volatility of 2021-2023, material costs have stabilised but at significantly higher levels than pre-pandemic. Some products remain in constrained supply, affecting both pricing and lead times.
| Material | Price vs 2019 | Lead Time |
|---|---|---|
| Structural Steel | +45% | 4-6 weeks |
| Timber | +30% | 1-2 weeks |
| Concrete/Aggregates | +25% | Standard |
| Bricks | +35% | 2-8 weeks |
| Rooflights | +40% | 4-8 weeks |
| Insulation | +50% | Standard |
| Windows/Doors | +35% | 6-12 weeks |
Strategies to Navigate
- 1.Order long-lead items (steel, windows, rooflights) early—even before starting on site
- 2.Consider alternative materials where appropriate (e.g., timber frame vs steel)
- 3.Include 10-15% contingency in your budget for price fluctuations
- 4.Ask your builder about material price fixing in contracts
Planning Department Delays
Stretched resources affecting decision times
London councils continue to struggle with planning application volumes. Budget cuts, staff shortages, and increased complexity of applications mean that the statutory 8-week target is frequently missed.
Average Decision Times (2024 Data)
"The biggest frustration is condition discharge. You get permission, think you're ready to start, then wait another 8 weeks for conditions to be signed off. Build this into your programme."
— London-based architect
Strategies to Navigate
- 1.Submit complete applications—validation delays add weeks
- 2.Use pre-application advice services where available
- 3.Consider Certificate of Lawfulness for PD projects—avoids planning queue
- 4.Submit condition discharge applications promptly after approval
Building Regulations Changes
Part L and Part O adding cost and complexity
The 2022 changes to Part L (energy efficiency) and introduction of Part O (overheating) have significantly impacted how extensions are designed and built. While beneficial for carbon reduction, they add both cost and complexity.
Key Regulatory Changes Affecting Extensions
Part L: Conservation of Fuel and Power
Requires improved U-values for walls, roofs, and floors. Extensions must now meet higher insulation standards, affecting construction methods and costs. Typical additional cost: £2,000-£5,000.
Part O: Overheating
New requirements to prevent overheating. Particularly challenging for south-facing extensions with large glazing. May require specific glass types, ventilation, or blinds. Typical additional cost: £1,000-£3,000.
Part F: Ventilation
Updated requirements for background and extract ventilation. Tighter buildings need more mechanical ventilation. May require MVHR in some cases.
Strategies to Navigate
- 1.Budget for improved specification from the start
- 2.Work with an architect familiar with Part O requirements early in design
- 3.Consider orientation and glazing ratios carefully
- 4.Factor SAP/overheating calculations into design fees
Party Wall Complications
Neighbour disputes and surveyor costs rising
Party wall matters continue to be a significant source of delay and cost for London extension projects. With property values high and neighbours increasingly aware of their rights, disputes are more common and settlements higher.
Typical Party Wall Costs in 2025
Strategies to Navigate
- 1.Serve party wall notices early—allow 3-4 months buffer
- 2.Talk to neighbours before formal notices to build goodwill
- 3.Use an agreed surveyor where possible (cheaper than two surveyors)
- 4.Budget conservatively—assume awards will be needed
Financing Challenges
Higher rates impacting project viability
Interest rates remain significantly higher than the historically low levels homeowners became accustomed to. This affects both the cost of borrowing for the project and the overall financial viability of extending versus moving.
Financing Landscape
Remortgage
Releasing equity through remortgage remains popular, but higher rates mean monthly payment increases are more significant. Some homeowners finding their existing deal is better than available rates.
Further Advance
Borrowing additional funds from current lender often at different (usually higher) rates. Can avoid early repayment charges on existing mortgage.
Personal Loans
Suitable for smaller projects. Rates typically higher than secured lending but faster to arrange and no property tie.
Strategies to Navigate
- 1.Get detailed quotes before approaching lenders
- 2.Consider phasing work if full budget isn't available
- 3.Factor in all costs (fees, furniture, landscaping) not just build costs
- 4.Use a mortgage broker to find best deals
Consultant Coordination
More specialists required, more coordination needed
Modern extension projects often require multiple specialist consultants beyond the architect and structural engineer. Coordinating these professionals, their timelines, and their outputs has become a significant project management challenge.
Specialists You May Need
Planning Stage:
- • Planning consultant
- • Heritage consultant
- • Tree surveyor (arboriculturist)
- • Ecologist
- • Transport consultant
Technical Design:
- • Structural engineer
- • Drainage consultant
- • Fire engineer
- • M&E engineer
- • SAP assessor
Strategies to Navigate
- 1.Ask your architect to coordinate consultants as part of their service
- 2.Identify consultant needs early in the project
- 3.Use consultants recommended by your architect (established working relationships)
- 4.Allow time for consultants to coordinate—rushed reports cause problems
Looking Ahead: 2025 Outlook
Despite these challenges, London's extension market remains active. Homeowners continue to prefer improving their existing properties over the costs and upheaval of moving, particularly given stamp duty implications and the competitive housing market.
Reasons for Optimism
Material prices have largely stabilised after years of volatility
Training initiatives are beginning to address skills shortages
Interest rates may ease through 2025, improving affordability
Extensions continue to add significant value to London properties
Planning Your London Extension?
Understand your property's planning constraints and permitted development rights before you start. Our instant report covers conservation areas, listed buildings, Article 4 directions, and more.
Check Your PropertyRelated Articles
London Extension Costs 2025
Complete guide to what you'll pay for different extension types.
Permitted Development Rights London 2025
What you can build without planning permission this year.
Top Fire Safety Consultants in London
Expert guide to fire engineers for your extension project.
Top Tree & Ecology Consultants in London
Find arboriculturists and ecologists for your project.